Abingdon,
29
August
2018
|
14:28
Europe/London
Abingdon's Wootton Road resurfaced
Our highways maintenance team have been out on Wootton Road in Abingdon.
A total of £245,000 has been spent carrying out resurfacing, lining and rebuilding a raised crossing by the school.
The team resurfaced from the school to the junctions with Bath Street and Faringdon Road – a distance of around 550m and a total area of 3500m2 .
The photos show the results of the work – a nice new surface without potholes, with fresh new markings and high friction surfacing either side of the refurbished crossing.