Oxford,
24
July
2017
|
16:17
Europe/London

Dorchester & Wallingford Roadworks 24 July 2017

B4009 Wallingford Road, Mongewell, Wallingford, Oxfordshire

24 July — 31 July

Delays possible Traffic control (two-way signals)

Works location: Approx 440m Sw Jnc A4074 To O/S The Old School House On, Wallingford Road

Works description: Install 141m Of 1 Way Poly Duct In Verge,Install 35m Of 1 Way Poly Duct In Carriageway

Responsibility for works: BT

Current status: Planned work about to start



B4016 Main Road, Appleford, Abingdon, Oxfordshire

24 July — 26 July

Delays possible Traffic control (two-way signals)

Works location: Junction Oppposite Appleford Level Crossing...

Works description: Jetting Out Of The Existing Culvert At The Level Crossing. Part Of The Appleford S&C Renewal Sche...

Responsibility for works: Network Rail Infrastructure Ltd

Current status: Advanced planning


B4016 Road Between Woodside Farm Junction And Appleford, Long Wittenham, Abingdon, Oxfordshire

24 July — 26 July

Delays possible Traffic control (two-way signals)

Works location: Junction Oppposite Appleford Level Crossing...

Works description: Jetting Out Of The Existing Culvert At The Level Crossing. Part Of The Appleford S&C Renewal Sche...

Responsibility for works: Network Rail Infrastructure Ltd

Current status: Advanced planning